EDUCATION

Little Sunshine’s Playhouse & Preschool

4220 Highway K, O’Fallon, MO 63368

  • Scope included site development, shell and interior construction for the 10,700-square-foot school and the 7,650-square-foot outdoor playground.

  • Site development, building construction, interior buildout and playground construction totaled nearly $2.7 million, delivered under budget and faster than scheduled.

  • Building features foster children’s innate curiosity and potential with a distinctive castle-like exterior opening to interior spaces filled with natural light, order and beauty.

  • Building materials placed child safety and security foremost for children aged six weeks to age six.

  • Child-size exploration elements include BEX-built treehouses and other unique spaces, both inside and outside the school.

  • Completed in 2019.

“In 2017, Little Sunshine’s Playhouse chose BEX Construction to build our location in O’Fallon, Mo., our second in the metro market. The outstanding communication and drive to meet and exceed our expectations stood out immediately. Shortly after construction began, it was clear who we wanted to take on our next project in the St. Louis market. BEX builds top-notch quality and their post-project services are outstanding.”

Luke Riddle, Director of Properties and Development, Little Sunshine’s Playhouse & Preschool

First St. Charles United Methodist Church (UMC) Learning Center

801 First Capitol Drive, St Charles, MO 63301

  • This $200,000 conversion of a full-size gymnasium created an adaptable multipurpose space that is fully sprinklered, making it accessible for use by children and large groups.

  • The space was brightened substantially by changing existing lighting to LED lamps and by expertly adding windows through the concrete block and brick exterior.

  • A new double-door portal expertly crafted from teak wood accents the entry.

  • New acoustical tiles provided effective sound attenuation.

  • BEX won the project based on its exemplary performance on a $2.2 million facility renovation in 2018.

  • Begun in September 2022 and completed in January 2023.

“BEX took extra care throughout construction to ensure safety and cleanliness to safeguard our staff and children who remained close-by throughout the project. We were able to continue running full-tilt during the entire the renovation. We’re so pleased with BEX’s results.”

Jack McCormick, Office Manager, First St. Charles United Methodist Church

Previous
Previous

DISTRIBUTION / WAREHOUSE

Next
Next

HEALTHCARE