DISTRIBUTION / WAREHOUSE

Hazelwood Tradeport Building 1

4801 Trade Access Blvd., Hazelwood, MO 63042

  • This 252,300 sq. ft. logistical warehouse in NorthPoint Development’s Hazelwood Tradeport was BEX Construction Services’ first tilt-up construction project.

  • BEX fast-tracked foundations and building slab construction to beat the clock on winter weather for tilt-up panels.

  • Early completion of $7.9 million distribution center gave NorthPoint Development a jump on early leasing for this logistics warehouse.

  • Steel and concrete within each of the 114 tilt-up panels weighed 80 tons; typical panel measured 55 feet high x 26 feet wide x 9 inches thick.

  • 36-foot interior clear heights for automated warehouse operations.

  • 72 trailer stalls, 30 dock positions, four drive-in docks and ESFR sprinkler system.

  • Completed in only six-and-a-half months in early 2021.

“BEX has been a reliable partner in developing several facilities in our 336-acre Hazelwood TradePort development. BEX provides competitive bids matched with compatible business fundamentals to deliver completed construction ahead of schedule.”

Nathan Brinker, Owner’s Representative, NorthPoint Development

Hazelwood Tradeport Building 5

1575 Tradeport Drive, Hazelwood, MO 63042

  • The 412,500 sq. ft. Building 5 in NorthPoint’s Hazelwood Tradeport was built by BEX while also constructing Building 1, both on fast-track schedules to meet market demand for logistical warehouse space.

  • The $11.3 million tilt-up concrete construction project, measuring 796 feet long and 520 feet wide, was completed in seven months against weather challenges for delivery in early 2021.

  • Careful preconstruction planning forged a team ready and able to move in lockstep with an aggressive schedule.

  • Automated warehouse operations enabled with 40-foot interior clear heights, LED high bay lighting, and seven-inch thick, 4,000 PSI concrete flooring.

  • 40 dock positions with knockouts for up to 24 additional docks.

  • 96 remote trailer parking stalls.

  • BEX also completed an additional $5.5 million interior buildout and finish construction project for Ryder, the building’s first tenant.